| Shear walls and the second story framing begins. |
  |
| Jason and Darren in the back |
 |
| The view out Jeanette's room, and me coming up the stairs.
The boards sitting on the floor are plates, the tops and bottoms of the
walls that will be going up, and you can see where the rooms will be. |
 |
| Putting up the front wall. |
 |
| Jason, Trevor (the framing guru), and Darren collaborate
over the blueprints. |
 |
| A shot from the back of the house. |
 |
| Interior shots. |
 |
| Trevor probably suggesting I do something useful like make
another Krispy Kreme run. |
 |
| Interior shots. |
 |
| In front of the Master Bedroom windows |
 |
| Friday, March 5th, the roof trusses arrive. |
 |
| The only level area the crane operator can find is next
door. He sets up and unloads the truck. |
 |
| Testing the reach - he extends the full 100 feet to make
sure he can reach the other side of the house. |
 |
| Moving the trusses onto the house. Because he is so far
extended he needs to do the far side of the house one at a time. |
 |
| Darren bundles them together while Trevor and Jeremy guide
them onto the house. |
 |